SCOPE OF WORK / PROJECT SPECIFIC
Keep assets working.
The final scope depends on site assessment, agreed responsibilities and applicable approvals.
Preventive maintenance
- Condition inspections and routine checklists
- HVAC filters, belts, coils and fan service
- Pump, valve and mechanical equipment servicing
- Electrical distribution inspection and retightening programmes
- Asset records, service reports and work recommendations
Corrective works & replacement
- Fault tracing and equipment assessment
- Repair and replacement of damaged service components
- Air-conditioning units, pumps and distribution replacements
- Leak repair, local piping and duct alterations
- Post-repair verification and return-to-service checks
Retrofit & performance improvement
- HVAC capacity and zoning modifications
- Lighting and control system modernisation
- Equipment replacement within existing service networks
- Distribution rearrangement for renovated spaces
- Phased works in occupied or operating facilities
Facility modifications
- Technical room and plant-room refurbishment
- Roof, wet-area and envelope repairs
- Service access improvements and equipment platforms
- Local civil, MEP and architectural repair packages
- Handover of updated records and maintenance information
Practical deliverables.
- An asset list and prioritised maintenance or replacement scope
- Service findings, actions and unresolved items recorded by asset
- Updated maintenance information and recommended follow-up
Before defining the scope
01How is a preventive maintenance programme scoped?+
Start with equipment data, manufacturer guidance, usage, service history and the consequences of downtime. Frequency and tasks should reflect these inputs and the actual condition of the assets, rather than a single schedule applied to every system.
02What should a maintenance contract include?+
List the covered assets, agreed tasks, visit frequency, reporting format and access responsibilities. State how spare parts, consumables, additional repairs and call-outs are handled, together with any agreed response arrangements. Use equipment guidance and actual operating conditions to define the work; “comprehensive maintenance” needs a written list of inclusions and exclusions.
03How is a repair enquiry separated from a replacement project?+
Describe the observed issue, service history and effect on use first. A repair scope addresses the findings of the assessment; replacement also needs confirmation of dimensions, capacity requirements, connections, controls and access. Ask for the basis of the recommendation, remaining uncertainties and required acceptance checks before committing to procurement.
Photography illustrates the discipline and does not represent a completed project.